Gutted
Had to rip out about seven inches of sweater front this lunchtime because I'd forgotten to put in the armhole shaping. That's over 50g of wool undone, a whole week of work pulled out in 20 minutes. I'd thought I was doing so well.
Almost finished the armhole decreases tonight, dumping 16st of moss stitch should make the rest go a tad faster, but it's still a lot of work down the drain.
*sigh*