Gutted

Had to rip out about seven inches of sweater front this lunchtime because I'd  forgotten to put in the armhole shaping.  That's over 50g of wool undone, a whole week  of work pulled out in 20 minutes.  I'd thought I was doing so well.

Almost finished the armhole decreases tonight, dumping 16st of moss stitch should make the rest go a tad faster, but it's still a lot of work down the drain.

*sigh*

Subscribe to Quantum Tea

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe
Follow me on Mastodon